Energy Management
Energy ManagementEnergy Management
item4b1b1a1Energy Management

CVM-R8 CPP

 

  • Control up to 17 loads or groups of loads using contactors
  • Minimal response time to disconnect / connect loads
  • Connects to the utility meter’s isolated pulse output. Can also connect to any of our measuring devices when a utility pulse is not available.
  • Calculates Maximum Demand using Fixed (Block) demand method.
  • Prioritizes the loads to be disconnected when reaching the maximum demand limit.
  • Utilizes load connection offsets to prevent tripping of circuits due to motor start up curves.
  • Alarm indication in the event of synchronization signal loss.
  • Predictive demand control.
  • There are three additional inputs used to select tariffs and to control the loads associated with those tariffs.
CVMR8CPP

Fixed demand
The CVM - R8 CPP is connected to the synchronization pulse generated from the utility company’s demand. When the CVM-R8 CPP receives the pulse it ends one demand period and starts the next demand period.

 

Measurement by impulse
Measurement of consumed energy (kWh), during each demand period, is calculated by counting KYZ pulses from the utilty meter. If a utility pulse is not available then connect the CVM-R8 CPP to any of our measuring devices that elicit a pulse.

Maximum Demand
Control Solutions

 

DH96 CPP

CVM-R8 CPP

CA-4 / MR-3

MaxDemandProducts1

Plug100horiz

Product Information:
PDFiconsmtrans1a1aMaximum Demand Solutions overview
PDFiconsmtrans1a1a1Maximum Demand in-depth

 

Add-ons:
PowerStudio: Energy Management Software


sales@measurlogic.comP: 1-877-PQ-SOLNS (877-777-6567)F: 425-799-4780Measurlogic, Inc. 2007

Your Energy Efficiency Partner

Measurlogic > Energy Management > Maximum Demand Control > Soutions > CVM-R8 CPP

DownloadsDownloads

Measurlogic HomeHome

Contact UsContact Us

Trade ShowsTradeshows

MeasurlogicHome