| DH96 CPP
- Control up to four loads or groups of loads using contactors
- Minimal response time to disconnect / connect loads
- Connects to the utility meter’s isolated pulse output. Can also connect to any of our measuring devices when a utility pulse is not available.
- Calculates Maximum Demand using either the Rolling, Fixed (Block) Synchronization or Thermal demand methods.
- Prioritizes the loads to be disconnected when reaching the maximum demand limit.
- Comes with software, when ordered with communications, to trend from 1 - 60 minute records of both consumption and relay change of states (opening and closing of relays).
- Substantial recording and control capabilities housed in a standalone unit priced for a short-term return on investment.
- Select between Preventive or Predictive demand control in the same unit.
| |
 |  |  |
Your Energy Management and Power Quality Partner